The limited objective of project control deserves emphasis.Project control procedures are primarily intended to identify deviations from the project plan rather than to suggest possible areas for cost savings.This characteristic reflects the advanced

来源:学生作业帮助网 编辑:作业帮 时间:2024/05/02 10:18:34
The limited objective of project control deserves emphasis.Project control procedures are primarily intended to identify deviations from the project plan rather than to suggest possible areas for cost savings.This characteristic reflects the advanced

The limited objective of project control deserves emphasis.Project control procedures are primarily intended to identify deviations from the project plan rather than to suggest possible areas for cost savings.This characteristic reflects the advanced
The limited objective of project control deserves emphasis.Project control procedures are primarily intended to identify deviations from the project plan rather than to suggest possible areas for cost savings.This characteristic reflects the advanced stage at which project control becomes important.The time at which major cost savings can be achieved is during planning and design for the project.During the actual construction,changes are likely to delay the project and lead to inordinate cost increases.As a result,the focus of project control is on fulfilling the original design plans or indicating deviations from these plans,rather than on searching for significant improvements and cost savings.It is only when a rescue operation is required that major changes will normally occur in the construction plan.怎么翻译啊

The limited objective of project control deserves emphasis.Project control procedures are primarily intended to identify deviations from the project plan rather than to suggest possible areas for cost savings.This characteristic reflects the advanced
项目控制的有限目标值得重视.项目控制过程主要是为了区分项目计划是否偏离,而不是为了建议节约成本的可能区域,这个特征表现在项目控制变得重要的高级阶段.主要的成本节约在计划和设计项目期间可以达到.在实际的建设过程中,变化可能推迟项目而导致过度的成本增加.结果,项目控制的焦点满足原设计计划或指示偏离这些计划,而不是在寻找显著的改善或成本节约.只有在建设计划中发生重大变化时营救行动才会被要求

有限的目标的项目控制值得重视。项目控制程序主要打算鉴定项目计划的情况,而不是建议可能赋存区节约成本。这种特性体现的是高级阶段,在这个阶段,项目控制变得很重要。的主要成本存款可以获得在规划和设计的项目。在实际施工可能晚点变化,项目和导致无节制的成本...